Humber

The Humber area has been chosen as one of the new study areas in which to trial the Seabed Prehistory project methodologies in the 2004 – 2007 season. A survey area has been chosen adjacent to licensed dredging areas.

The survey methodology from the Round One survey will be applied including seismic survey, vibrocoring and grab sampling. Geophysical survey data has been collected and is currently being processed. This part of the project is due to be completed in March 2007 which will include an interpreted suite of geophysical and geotechnical data.